Description |
In general, the project consists of all labor, materials, tools, equipment, and incidentals necessary to remove and dispose of the old generators and install and commission permanent, 125 kW, backup power generators at the Stuart Street and Leimert Tank Sites. The Stuart Street Site will require the demolition of an existing concrete pad and the installation of a new concrete pad. The Leimert Site will require the installation of approximately 25 feet of above-ground conduit and conductors.
|